The Bosta 70 frame scaffold from Thyssen-Hunnebeck complies with DIN 4420, Part 1 and HD 1000. For the standard version in steel or aluminium Bosta 70 has a general building law approval.. It can be used as: - working scaffold - protective scaffold - protective roof scaffold The maximum erection hight of the standard version is 24m. For taller or non-standard scaffolds individual static calculations are required.


Advantages of BOSTA 70
-
Economical and safe frame scaffold for renovation or new buildings
-
Suitable for walls or roofer‘s work, paintwork or facade paneling
-
Quick erection and disassembly, high stability and safe handling
-
Simple and inevitable (= forced) assembly by one scaffold erector only
-
High adaptability to all lengths, widths, heights, and obstructive areas
-
Bay and storey-wise dismantling and re-assembly (‘‘wandering“)
-
Can be turned into a mobile scaffold by using only a few extra parts
-
Usable for stairways or supporting structures for temporary shelters
-
Max. perm. platform load: 200 kg/m² / general building law approval
-
Scaffold class 3, complying with DIN 4420, Part 1 (and with HD 1000)
-
Hot-dip galvanized steel parts, timber planks protected against rot
Components Bosta 70




|