Image

Modular scaffolding can be used for shoring in any construction project. With the use of suitable dimension ledgers the verticals are connected to form a grid with the specified loading capacity in accordance with the requirements of each concreting project.

Image

Image

Advantages of Cuplok

  • Strong 64kN per leg
  • Savings in erection times - fast to assemble 
  • Simple to erect 
  • Systemised bracing reduces labour costs 
  • Galvanised - for ease of handling and low maintenance 
  • Full design support - with C.A.D. 
  • Fully Systemised - can eliminate tube and loose fittings
  • Components up to 20% lighter than traditional counterparts
  • Versatile for support and access
  • Confidence from in-depth technical support

 

Image
1. Locate the blade end of ledgers and transoms into lower cup

 

Image
2. Slide the upper cup down the standard and rotate

 

Image
3. Tighten with a hammer blow

 

Image
4. A positive and rigrid connection of up to four units is achieved in one single action

 

Image

Image

"L"

Length (mm) centre to centre of Verticals

Weight (kg)

600
900
1000
1200
1300
1600
1800
2500

2.65
3.73
4.10
4.81
5.17
6.24
6.96
9.50

Image

Image